Filter :
Standard and/or project | Stage | TC |
---|---|---|
Acoustics — Measurement of noise emitted by railbound vehicles |
95.99 | ISO/TC 43 |
Railway applications — Acoustics — Measurement of noise emitted by railbound vehicles |
95.99 | ISO/TC 43/SC 1 |
Acoustics — Railway applications — Measurement of noise emitted by railbound vehicles |
90.92 | ISO/TC 43/SC 1 |
Railway applications — Acoustics — Measurement of noise emitted by railbound vehicles |
40.60 | ISO/TC 43/SC 1 |
Acoustics — Measurement of noise inside railbound vehicles |
95.99 | ISO/TC 43 |
Railway applications — Acoustics — Measurement of noise inside railbound vehicles |
95.99 | ISO/TC 43/SC 1 |
Railway applications — Acoustics — Noise measurement inside railbound vehicles |
60.60 | ISO/TC 43/SC 1 |
Railway applications — Braking system — Quality of compressed air for pneumatic apparatus and systems |
60.60 | ISO/TC 269/SC 2 |
Railway applications — Fire protection on railway vehicles — Part 1: General |
40.60 | ISO/TC 269 |
Railway applications — Calculation of braking performance (stopping, slowing and stationary braking) — Part 1: General algorithms utilizing mean value calculation |
90.92 | ISO/TC 269/SC 2 |
Railway applications — Calculation of braking performance (stopping, slowing and stationary braking) — Part 1: General algorithms utilizing mean value calculation |
30.99 | ISO/TC 269/SC 2 |
Railway applications — Calculation of braking performance (stopping, slowing and stationary braking) — Part 2: General algorithms utilizing step by step calculation |
90.92 | ISO/TC 269/SC 2 |
Railway applications — Calculation of braking performance (stopping, slowing and stationary braking) — Part 2: General algorithms utilizing step by step calculation |
30.99 | ISO/TC 269/SC 2 |
Railway applications — Rail project planning process — Part 1: Stakeholders and their needs/interests |
95.99 | ISO/TC 269 |
Railway applications — Rail project planning process — Part 2: Conditions |
95.99 | ISO/TC 269 |
Railway applications — Railway project planning process — Guidance on railway project planning |
60.60 | ISO/TC 269 |
Railway applications — Railway braking — Country specific applications for ISO 20138-1 |
95.99 | ISO/TC 269/SC 2 |
Railway applications — Railway braking — Country specific applications for ISO 20138-1 |
60.60 | ISO/TC 269/SC 2 |
Railway applications — Railway quality management system — ISO 9001:2015 and specific requirements for application in the railway sector |
60.60 | ISO/TC 269 |
Railway applications — Quality management system — Business management system requirements for rail organizations: ISO 9001:2015 and particular requirements for application in the rail sector |
95.99 | ISO/TC 269 |
Railway applications — Railway quality management system — ISO 9001:2015 and specific requirements for application in the railway sector — Amendment 1: Climate action changes |
60.60 | ISO/TC 269 |
Railway applications — Concepts and basic requirements for the planning of railway operation in the event of earthquakes |
60.60 | ISO/TC 269/SC 3 |
Railway applications — Driving simulator for drivers' training |
60.60 | ISO/TC 269/SC 3 |
Railway applications — Braking — General vocabulary |
60.60 | ISO/TC 269/SC 2 |
Railway Applications — Running time calculation for timetabling — Part 1: Requirements |
60.60 | ISO/TC 269/SC 3 |
Railway Applications — Running time calculation for timetabling — Part 2: Distance-speed diagrams and speed curves |
30.60 | ISO/TC 269/SC 3 |
No matching records found. Please try changing the filter settings.